D&I - September 17th 2012

DRAINAGE & INFRASTRUCTURE
STORM WATER MANAGEMENT
Committee Meeting Minutes
September 17, 2012

The Drainage & Infrastructure Committee met on Monday, September 17, 2012 at 7:00 p.m. at the Mayfield Village Civic Hall. 

Present: Tom Cappello (Engineer), Joanne Cinco (Co-Chair), Tom Marrie (Co-Chair), Tom Marsalis (Resident Representative), Doug Metzung (Service Director), and Susan Jerome (Committee Secretary)

Absent: Nick Delguyd (Council Representative) and Jerry Catalano (Resident Representative)

Fairchild 6786 Seneca

Approval to move forward was given by the committee. Anselmo's Inc. will perform the work at a cost of $5,700.00. Susan Jerome will mail the necessary paperwork to Mr. Fairchild and his neighbor, Barbara Keptnor at 6796 Seneca Rd.

Setlock 6818 Bonnieview

Approval to move forward was given by the committee. Anselmo's Inc. will perform the work at a cost of $9,320.00. Susan Jerome will mail the necessary paperwork to Mr. Setlock and his neighbor, Michael Tagg at 6828 Bonnieview.

Ciraolo, 848 Hardwood Court

Approval to move forward was given by the committee. Anselmo Landscaping will perform the work at a cost of $1,800.00. Susan Jerome will mail the necessary paperwork to Mr. Ciraolo.

Washington Blvd. Ext.

Doug Metzung, Service Director, and Tom Cappello, Village Engineer, visited the site and determined the work can be completed by the Service Department. The stone, at the end of the driveways at 1070 and 1090 Washington Blvd. Ext., has moved causing a low spot that collects water. Mayfield City Schools will be contacted to receive permission to be on their property to complete the work.

Tromba 6476 Derby Drive

The contractor has been notified to begin work. Susan Jerome will send a letter to Mr. Tromba advising him that work will begin soon.

Ferrante 6746 Sandalwood

Doug Metzung contacted Nanci Ferrante. A meeting with her and the surrounding residents has been set for either September 24th or 25th at 6:30 p.m. The committee is welcomed to attend. Susan Jerome will notify the committee on which date the meeting will take place.

Attached are the three proposal, from Anselmo's Inc., for the Bonnieview, Hardwood Ct., and Seneca projects.

The meeting adjourned at 7:14 p.m.